91男人影院-91嫩艹嫩艹-91你懂得-91农村精品一区二区在线-91农熟女-91女神

Current Location:Home > Product > IF induction series > Silicon controlled medium frequency forging furnace

2020-07-21 16:25:04

Share
  • Share to WeChat Moments

Infrared temperature measurement forging furnace

  • Description

Operation steps of infrared temperature measurement forging heating furnace

1) Passing water: Start the water pump and observe whether the water flow at the water outlet is normal.

2) Power on: first close the knife, then turn on the air switch at the back of the machine, and then turn on the power switch on the control board.

3) Setting: Select the operation mode (full automatic, semi-automatic, manual and foot control) according to your needs. When automatic and semi-automatic control, you need to set the heating time, holding time and cooling time (each time cannot be set to 0, otherwise it will not work properly). automatic cycle). Before using it for the first time and before you are proficient, you should use manual or foot control.

4) Startup: Before each start, the heating power potentiometer should be adjusted to the minimum as much as possible, and then slowly adjust the temperature to the required power after starting. Press the start button to start the machine, at this time the heating indicator on the panel is on, and there will be a sound of normal work and the simultaneous flashing of the work light.

5) Observation and temperature measurement: During the heating process, visual inspection is mainly used to determine when to stop heating based on experience. Inexperienced operators can use a thermostat to detect the temperature of the workpiece.

6) Stop: When the temperature reaches the requirement, press the stop button to stop heating. You can start it again after replacing the workpiece.

7) Shutdown: The machine can work continuously for 24 hours. The power switch should be turned off when not in use, and the knife or the air switch behind the machine should be turned off when not in use for a long time. When shutting down, the power should be cut off first and then the water should be cut off, so as to facilitate the heat dissipation inside the machine and the heat of the induction coil. Note: The machine should not work without load as much as possible, let alone run without load for a long time, otherwise, it will affect the performance and stability of the machine!


Maintenance of Forging Furnace with Infrared Temperature Measurement

When used in places with poor air environment, dust should be prevented from entering the inside of the machine, and water must not be splashed into the machine. To keep the cooling water clean, change it regularly. High temperature environment should maintain air circulation.

高頻10.jpg



Recommended Products

HOME About Us Product News Case Video Advantages Contact
主站蜘蛛池模板: 亚洲最新无码精品视频2025 | 欧洲亚洲第一区久久久 | 日本三级欧美三级人妇视频黑白配 | 国产精品观看无码不卡视频 | 国产精品亚洲手机观看每日更新 | 人人影视正版下载地址 | 日韩美香港a一级毛片 | 男女啪啪永久免费网站 | 狠狠色综合久久丁香婷婷 | 91精品伊人久久久大香线蕉91 | 无码人妻精品一区二区三区久久久 | 亚洲日韩av中文字幕无码 | 国产乱人伦偷精精品视频 | 性欧美大战久久久久久久久 | 99国内精品久久久久久久 | 波多野结衣办公室双飞 | 91精品天美精东蜜桃传媒入口 | 国产在线观看码高清视频不卡 | 91桃色安卓版app最新版下载1.0.6 | 啪啪av大全导航福利网址 | 亚洲国产美女精品久久 | 国产主播一区二区三区在线观看 | 亚洲熟女综合一区二区三区 | 国产一区二区三区在线免费观看 | 日韩电影在线观看完整版免费 | 精品夜色国产国偷自产91 | 亚洲国产欧美不卡在线观看 | 亚洲日韩av无码中文 | 亚洲成产国品一二二三区别 | 国产午夜精品久久久久免费视 | 国产无遮挡又黄又爽高清视 | 国产精品福利在线观看免费不卡 | 国产91影院 | 亚洲成在人线在线播放无码vr | 亚洲成aⅴ人片久青草影院 亚洲成aⅴ人片女在线观看 | 欧美大片在线观看完整版 | 天天做天天爱天天综合网 | 日韩高清一区二 | 亚洲aⅴ无码专区在线播放 亚洲aⅴ无码专区在线观看 | 青青草无码国产亚洲 | 免费高清电影 |