91男人影院-91嫩艹嫩艹-91你懂得-91农村精品一区二区在线-91农熟女-91女神

Current Location:Home > Product > Steel wire annealing > Aluminum bar forging furnace

2020-07-20 17:48:44

Share
  • Share to WeChat Moments

Round steel forging diathermy equipment

  • Description

圖片012.png

Operation steps of round steel forging diathermy equipment and bar diathermy forging equipment

1) Passing water: Start the water pump and observe whether the water flow at the water outlet is normal.

2) Power on: first close the knife, then turn on the air switch at the back of the machine, and then turn on the power switch on the control board.

3) Setting: Select the operation mode (full automatic, semi-automatic, manual and foot control) according to your needs. When automatic and semi-automatic control, you need to set the heating time, holding time and cooling time (each time cannot be set to 0, otherwise it will not work properly). automatic cycle). Before using it for the first time and before you are proficient, you should use manual or foot control.

4) Startup: Before each start, the heating power potentiometer should be adjusted to the minimum as much as possible, and then slowly adjust the temperature to the required power after starting. Press the start button to start the machine, at this time the heating indicator on the panel is on, and there will be a sound of normal work and the simultaneous flashing of the work light.

5) Observation and temperature measurement: During the heating process, visual inspection is mainly used to determine when to stop heating based on experience. Inexperienced operators can use a thermostat to detect the temperature of the workpiece.

6) Stop: When the temperature reaches the requirement, press the stop button to stop heating. You can start it again after replacing the workpiece.

7) Shutdown: The machine can work continuously for 24 hours. The power switch should be turned off when not in use, and the knife or the air switch behind the machine should be turned off when not in use for a long time. When shutting down, the power should be cut off first and then the water should be cut off, so as to facilitate the heat dissipation inside the machine and the heat of the induction coil. Note: The machine should not work without load as much as possible, let alone run without load for a long time, otherwise, it will affect the performance and stability of the machine!


Maintenance of round steel forging diathermy equipment and bar diathermy forging equipment

When used in places with poor air environment, dust should be prevented from entering the inside of the machine, and water must not be splashed into the machine. To keep the cooling water clean, change it regularly. High temperature environment should maintain air circulation.

高頻10.jpg


Recommended Products

HOME About Us Product News Case Video Advantages Contact
主站蜘蛛池模板: 91精品国自产在线偷拍蜜桃 | 亚洲爆乳无码一区二区三 | 国产一区二区高清在线 | 亚洲欧美日韩综合俺去了伊人 | 日韩国产激情在线播放 | 国产精品三级国语在线看 | 国产又滑 | 日韩av片无码一区二区不卡 | 久久精品国产亚洲av无码麻豆 | 无码精品久 | 麻豆最新国产剧情av原创免费 | av无码专区 | 欧美超碰刺激久久 | 国产剧情精品 | 波多野结衣在线调教免费观看 | 伊人大香线蕉影院 | 亚洲成a人片在线观看无码 亚洲成a人片在线观看无码3d | 日韩欧美中文精品电影 | 婷婷色综合蜜桃久久 | 日韓av東京社區男人的天堂 | 天天碰免费上传视频 | 99热在线观看 | 亚洲精品自偷自拍无码忘忧 | 国产精品一级做a爰片性色毛片国产一级a毛 | 五月在线婷婷视频 | 18禁午夜 | 国产午夜电影久久 | 99久久精品国产波多野结衣 | 亚洲国产激情一区二区三区 | 亚洲无日韩码精品 | 日本三级手机在线播放线观看 | 国产伦精品一区二区三区免费 | 国产精品九九在线播放麻豆 | 色播久久 | 天天天天做夜夜夜夜做 | 亚洲香蕉视频 | 夜夜精品无 | 免费毛片a在线观看手机 | 亚洲一区二区三区精品蜜桃久久 | 玩两个丰满老熟女久久网 | 国产薄丝袜脚交视频一区二区三区 |