91男人影院-91嫩艹嫩艹-91你懂得-91农村精品一区二区在线-91农熟女-91女神

Current Location:Home > Product > IF induction series > IF power supply

2018-10-26 10:13:27

Share
  • Share to WeChat Moments

RAZ-400KW intermediate frequency power supply---+---furnace shelf (combination)

  • Description

Induction Heating Power Supply--Safety Operation Guide


1. Before starting the machine, first check whether the water, gas and electricity are connected. After connecting, the following operations can be performed;

2. The operator must prepare corresponding insulating shoes, gloves, etc.

3. The operator must have the corresponding electrical knowledge.

4. Before the equipment is overhauled, the electric switch must be pulled off to confirm that the power supply is disconnected, and then the discharge treatment is carried out, and then the overhaul card is hung up, and the overhaul is repeated.

5. Before starting the machine, first make sure that the waterway is normal and all parts of the equipment are normal before starting the machine.

6. Turn on the first gear filament first, then turn on the second gear filament after five minutes, and then send the high voltage after another five minutes.

7. Before sending high voltage, make sure that the output adjustment potentiometer is in a small position, and then send high voltage, and adjust the output voltage to the working voltage.

8. After confirming that there is a workpiece, you can press the heating button to make the equipment work, but no-load heating is not allowed.

9. If there is an abnormality in the equipment during work, the power supply must be disconnected immediately, and the reason should be checked before working again.

10. After the equipment is finished working, first disconnect the heating, then disconnect the high voltage, then turn off the filament and disconnect the power supply.

11. After the equipment stops working, wait for five minutes before disconnecting the water source.

12. During the operation of the equipment, if there is a temporary need to leave, it must be done. People leave the machine and stop it. It is not allowed. The machine is still working when there is no one.


weekly maintenance

1. When taking over the shift, check the flow of the cooling water outlet pipe of the equipment for abnormal phenomena. For equipment that uses evaporative cooling tubes, it is necessary to check whether the water level of the distilled water tank is qualified;

2. When taking over, check whether the cooling air volume of the glass shell and core column of the electronic tube and other ventilation and heat dissipation facilities are normal;

3. Check whether the contacts of each AC contactor are ablated and whether the wiring is loose;

4. Measure the insulation resistance of cooling water. The ground resistance of the anode of the water-cooled tube should be greater than 300K ohms;

5. The cooling water pipes of the electronic tube grid and the filament are mostly rubber tubes, which are easy to age and should be carefully checked. For the rubber tube that is aging and about to break, it should be updated in time;

6. Do a cleaning and dust removal on the inside of the chassis, wipe off the dust of each high-pressure porcelain bottle and insulating pillars, and pay attention to the cleaning of the dust filter on the air inlet of the fan. Prevent the air intake from being blocked and reduce the air output.


Semi-annual maintenance

1. Check whether the insulation performance of the low-voltage electric control circuit is qualified;

2. Use a megohmmeter to detect the insulation resistance of high-voltage devices such as high-voltage rectifier transformers, high-voltage cables, and high-voltage silicon stacks, and the value should meet the requirements;

3. Check the roundness of the inner tube of the water jacket of the electronic tube and the height of the positioning protrusion, so as to prevent the partial overheating of the anode caused by the deviation of the tube. And check whether there is scaling at the water jacket outlet and inlet pipe joints, and whether the anti-corrosion electrode is normal; 4. Check the set current value of each overcurrent relay;

5. For connecting conductors with high temperature during operation, such as filament lead wires, soft connecting wires for welding transformer primary coils, etc., if there is poor oxidation contact, additional treatment should be made;

7. Thoroughly clean the hidden places such as the top of the cabinet and the cable trench.


Link to this article:http://m.cncnr.cn/en/product/product20181026142.html
Previous:NO!
Next:NO!

Recommended Products

HOME About Us Product News Case Video Advantages Contact
主站蜘蛛池模板: 任你躁国语自产一区在电影在线播放 | 中文无码乱人伦中文视频 | 无码一区二区波多野结衣播放搜索 | 午夜无码片在线观看影院 | 日韩影院在线观看 | 陌陌97超碰在线人人操 | 日韩无码大片亚洲人成电影网站 | 亚洲亚中文久久精品无码v 亚洲亚洲人 | 日韩一二三区免费视频观看 | 欧美丰满熟妇乱xxxxx网站 | 99精品无人区乱码在线观看 | 欧美丰满熟妇乱xxxxx网站 | 91精品人妻一区二区三区 | 亚洲av乱码| 99久久精品国产一区二区三区 | 国产三级级在线电影 | 91香蕉国产线观看免费 | 一卡二卡三卡在线观看 | 91精品国产麻豆国产自产在线 | 免费在线观看污污视频 | 成人国产精品高清在线观看 | 欧美成人一区二区三区 | 国产精品福利在线观看免费不卡 | 日韩精品欧美在线成人 | 亚洲国产精品va在线看黑人 | 四虎影院| 综合一区二区三区 | 国产精自产拍久久久久久蜜 | 日韩乱码人| 中文字幕无码a片久久东京热喷水 | 三三影院 | 国产精品视频高清在线播放 | 免费福利网站在线观看 | 成人精品在线观看 | 天天免费国产永久入口 | 亚洲女人高清a毛片 | 一区二区在线观看视频 | 国产精品不卡一区二区 | 青春草无码精品视频在线观看 | 亚洲的天堂在线中文字幕 | 国产午夜亚洲精品电影网 |